In a move to speed up city transport improvement, the Prime Minister of Thailand, Prayut Chan-o-cha, is scheduled to look at the Pink Line city rail project‘s ongoing progress tomorrow before it’s set to start its trial operations. This announcement came from Anucha Burapachaisri, the appearing government representative.
This inspection go to is centred on the Pink Line, an enormous elevated monorail prepare initiative spearheaded by the Mass Transit Authority of Thailand (MRTA). The Pink Line, which spans Khae Rai to Min Buri, has been proposed to enhance connectivity within the north of Bangkok and Nonthaburi by intersecting with 5 main public transit lines. With Worldwide of 34.5 kilometres, the Pink Line will house 30 stations as soon as operational.
In phrases of delegation, the prime minister will be joined by Anupong Paojinda, the Interior Minister, Thanakorn Wangboonkongchana, Prime Minister’s Office Minister, and Athirat Rattanaseth, the Deputy Transport Minister. The entourage will meet on the Min Buri station around 1.30pm to hear a comprehensive briefing from the MRTA governor, adopted by a visit to the convergence level of the Orange Line. Post this, they’ll have interaction in a check run, from Min Buri to Lat Pla Khao station, reported Bangkok Post.
A recap of the development updates revealed that by June of this yr, the Pink Line’s construct was roughly ninety six.97% completed and the electrical system stood at 97.34% completion, leading to an overall development of ninety seven.15% shared Anucha.
According to a confidential supply from the transport ministry, the Northern Bangkok Monorail Company Limited (NBM) is all set to operate the road after being granted the appropriate permission. Initially, the NMB had forecasted that the Pink Line would be commencing trial runs in January, with full services kicking off by June 2024..